Tsanga C Hydroelectric Power Station

20251216_112605

Tsanga C Hydroelectric Power Station

  • River – Tsanga River, Nyanga
  • Installed Capacity – 3.27 MW
  • Head – 157 meters 
  • Penstock Size – 1,200mm diameter 
  • Penstock Length – 2,400 meters 
  • Penstock flowrate – 3.25m3/s
  • Turbine Design – Turgo turbine manufactured by Gilbert Gilkes & Gordon Ltd.  
  • Commissioned 2025